EN
Electrical heating coil for CDF dehumidifier
Terminal Rail Assembly Procedure
1. Use flat screwdriver
to remove terminal
rail blocks.
3. The terminal rail
block can also be
clipped on.
4. Place bridge in the
three blue terminal
rail blocks.
6. Glass fuse in large
terminal rail block.
10A 5x20mm
30
2. Slide additional
terminal rail blocks
into place in this
order.
5. Press bridge firmly
into place.
6. Activate heater
as described in
operation chapter,
section "Code ºC"