Start-up
Requirements
• Check whether all air filters have been inserted properly.
• Check whether all doors, flaps and covers are closed or
screwed in place.
• Check whether all air transport lines have been connected
and screwed down properly and whether they are secured
by means of tension belts.
• Check whether all air transport routes are clear and free
from foreign objects or obstacles.
• Check the permissible operating conditions according to
the technical data.
• Make the basic settings while observing the information
contained in the Technical annex if applicable.
Warning of electrical voltage
Work on the electrical components must only be
carried out by a qualified electrician!
Make sure that the electric installation complies with
the technical documentation.
Ensure the continuity of the protective conductor
system.
Initial start-up
If the "Flowmatic S" option is installed, continue with step 4.
For an ideal operation of the device the regeneration air flow
must be adjusted according to the technical data.
The potentiometers can be accessed via the front cover:
– target value fan speed process air (Proz.) and
– target value fan speed regeneration air (Reg.) for adjusting the
air volume via the fan speed.
For adjustment work, measurements or the like, which have to
be carried out during operation, one must on principle switch
over to manual operation (ON-SITE)!
13
1. Turn the selection switch to position I.
2. Open the front cover (9).
ð The two potentiometers are located behind the front
cover on the right-hand side:
– target value fan speed process air (Proz.) and
– target value fan speed regeneration air (Reg.) for
adjusting the air volume according to the information
provided in the technical annex.
3. Adjust the regeneration air volume in ON-SITE mode.
This also allows an adjustment to the on-site air transport
lines for optimum operation.
4. The proceed as with the normal start-up.