BH LKT8 Manuel Du Propriétaire page 14

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STEP 3
Place the completed console on the upright
tubes, align the holes of the handrails to
the holes of the upright tubes. Connect the
main wire through the console welding-base
and pull the wire from the upper holes of
console welding-base. Then stabilize them
with Socket Screws (d).
Note: Do not to damage the wires while
tightening the screws. Two people are
required for this step.
 
STEP 4
Place the Water Bottle Holder (J) on the
console base, and tighten with screw (f ).
Assemble the right and left handrails covers
(F, G) with Screw (e, h, i).
Note: Do not to damage the wires while
tightening the screws.
STEP 5
Place the Console (A) on the console base
and connect all wires. Hide all wires inside
the tube and tighten the Nut (g). Finally,
place the back cover (K) onto the back of
the console and screw it on using 4 Bolts
(o).
 
14

Publicité

Chapitres

Table des Matières
loading

Table des Matières