Tylo Prime+ 1611 Manuel D'utilisation page 6

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 67
Right Wall (Box #2):
• Place Right Wall section into the right slot of the Floor Panel
• Attach Back Wall to the Right Wall by lifting up the Right wall sliding into the corner interlock
brackets.
Left Wall (Box #2):
• Place Left Wall section into the left slot of the Floor Panel
• Attach the Back Wall to the Left Wall by lifting up the
brackets.
Note: When wall panels are connected in place properly the corners will be level and flush on top.
3 Person Infrared Sauna Prime+ 1611
wall slid
left
Page 6
into the corner interlock
ing
150612
Rev. 3

Publicité

Table des Matières
loading

Table des Matières