Tylo Prime+ 1611 Manuel D'utilisation page 12

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 67
• Lower the Ceiling panel by removing the rear Styrofoam blocks first and leaving the front
blocks until front wall installed. Be sure not to pinch any wires under the Ceiling panel.
Front Wall (Box #2):
• Start with the door and glass panel piece and move to the Floor panel slot.
• Place the Front Wall panel into the Floor panel slot.
• Have one person hold the door and glass panel, while another brings the last glass panel.
• While the left front glass piece is positioned, open the door to allow more work space.
Note: Secure the door from falling open and breaking while setting the Front Wall panel. It may be
helpful to use your knee to help push in the Front Wall panel while lowering into place.
3 Person Infrared Sauna Prime+ 1611
Page 12
150612
Rev. 3

Publicité

Table des Matières
loading

Table des Matières