Final Assembly - Luminance Brands kathy ireland HOME ION ECO Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6.1
Screw the two Threaded Studs (supplied) into the
tapped holes in the Hanger Bracket (Figure 17) .
6.2
Lift the Ceiling Cover up to the Threaded Studs and
turn until Studs protrude through the Holes in the
Ceiling Cover (Figure 18) .
Secure the Ceiling Cover in place by sliding
Lockwashers over the Threaded Studs and installing
the two Knurled Knobs (supplied) . (Figure 18) .
Tighten the Knurled Knobs securely until the Ceiling
Cover fits snugly against the Ceiling and the Hole in the
Ceiling Cover is clear of the Downrod .
WARNING
!
To avoid possible fire or shock, make sure that the
electrical wires are completely inside the outlet box and
not pinched between the ceiling cover and the ceiling.

6. Final Assembly

Figure 17
Figure 18
12
THREADED
STUDS (2)
CEILING
COVER
THREADED
STUDS (2)
LOCKWASHERS (2)
KNURLED KNOBS (2)
U.L. Model No.: CF5300

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cf5300bs00Cf5300orb00Cf5300grt00Cf5300sw00

Table des Matières