Final Assembly - Luminance Brands DORIAN ECO CF515BS00 Manuel Du Propriétaire

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6.1
Screw the Two Threaded Studs (supplied) into the
Tapped Holes in the Hanger Bracket (Figure 29) .
6.2
Lift the Ceiling Cover up to the Threaded Studs and
turn until studs protrude through the holes in the Ceiling
Cover (Figure 30) .
Secure the Ceiling Cover in place by sliding
Lockwashers (supplied) over the Threaded Studs and
installing the two Knurled Knobs (supplied) . (Figure 30) .
Tighten the Knurled Knobs securely until the Ceiling
Cover fits snugly against the ceiling and the hole in the
Ceiling Cover is clear of the downrod .
WARNING
!
To avoid possible fire or shock, make sure that the
electrical wires are completely inside the outlet box and
not pinched between the ceiling cover and the ceiling.
6.3
Place the Shade into the opening of the Light Fixture
Adapter, aligning the Three Flat Areas on the top edge
of the Shade with the Three Raised Dimples on the
Light Fixture Adapter and turn the Shade Clockwise
until it stops (Figure 31) .
NOTE: Periodically check that the Shade is seated
fully clockwise in the Light Fixture Adapter.
You have now completed the assembly of your new Ceiling Fan .
Please call Customer Service at 1-800-777-4440 if you have any questions about installation and operation of this
Ceiling Fan .

6. Final Assembly

Figure 29
1-1/4"
THREADED
STUDS (2)
#8 EXTERNAL
TOOTH
LOCKWASHERS (2)
Figure 30
LIGHT FIXTURE
ADAPTER RAISED
DIMPLES (3)
Figure 31
19
HANGER
BRACKET
HOLES (2)
THREADED
STUDS (2)
Please contact 1-800-777-4440 for further assistance
CEILING
COVER
#8-32 KNURLED
KNOBS (2)
FLAT AREAS (3)
SHADE
luminancebrands.com
ETL Model No.: CF515

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dorian eco cf515grt00Dorian eco cf515orb00

Table des Matières