Final Assembly - Luminance Brands Kathy Ireland Home ARLO INDOOR Manuel Du Propriétaire

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6.1
Screw the Two Threaded Studs (supplied) into the
Tapped Holes in the Hanger Bracket (Figure 28) .
NOTE: Be sure the wires stay on the outside of the
threaded rods when installing the ceiling cover.
6.2
Lift the Ceiling Cover up to the Threaded Studs and
turn until studs protrude through the holes in the Ceiling
Cover (Figure 29) .
Secure the Ceiling Cover in place by sliding
Lockwashers (supplied) over the Threaded Studs and
installing the two Knurled Knobs (supplied) . (Figure 29) .
Tighten the Knurled Knobs securely until the Ceiling
Cover fits snugly against the ceiling and the hole in the
Ceiling Cover is clear of the Downrod .
WARNING
!
To avoid possible fire or shock, make sure that the
electrical wires are completely inside the outlet box and
not pinched between the ceiling cover and the ceiling.
You have now completed the assembly of your new
Ceiling Fan .
Please call Customer Service at 1-800-777-4440
if you have any questions about installation and
operation of this Ceiling Fan .

6. Final Assembly

Figure 28
1-1/4"
THREADED
STUD (2)
#8 EXTERNAL
TOOTH
LOCKWASHER (2)
Figure 29
18
HANGER BRACKET
THREADED STUDS (2)
CEILING
COVER
#8-32 KNURLED
KNOB (2)
ETL Model No.: CF345 & CF355

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cf345bs00Cf355bs00

Table des Matières