Installing The Pump And Connecting It To The Pipework - Speck pumpen BADU 43 Traduction Des Instructions D'utilisation D'origine

Pompes no auto-amorçantes/ auto-amorçantes
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 76
Pos: 99 /Technische Dokumentation/Betriebsanleitung/Installation/Aufstellung/Pumpe aufstellen und an die Rohrleitung anschließen @ 0\mod_1427897347705_370.docx @ 27258 @ 3 @ 1
5.3.1

Installing the pump and connecting it to the pipework

1.
Install the pump in a horizontal and dry position. When doing
so, pay attention to the maximum distance to the water level,
i.e. geodetic height. See pump data sheet.
NOTICE
The motor can be damaged due to insufficient drainage!
Do not block or seal the drain gap between the pump housing
and the motor.
NOTICE
If it is sealed incorrectly, the thread can be damaged and the
sealing effect can be reduced!
Depending on the pump type, teflon tape or the unions enclosed
are used to install the pipe.
For ABS bonding, a curing time of at least 12 hours must be
observed.
NOTICE
The pump can be damaged by unauthorised mechanical strains
being placed on the pump!
Take the pipe up directly before the pump and connect it free
of tension.
2.
Connect the pipe free of tension according to the VDMA
standard sheet 24277. Compensators must be installed for
pipe diameters of 90 mm or larger. They are recommended
for diameters of 75 mm.
3.
Ensure that any leaks cannot cause consequential damage.
Install a suitable retainer if necessary.
WARNING
Pumped fluid hazardous to health!
Observe legal regulations regarding the disposal of media
hazardous to health.
Pos: 101 /Technische Dokumentation/Betriebsanleitung/Installation/Elektrischer Anschluss/Elektrischer Anschluss @ 7\mod_1472021948294_370.docx @ 94173 @ 2 @ 1
04|2017
Installation
EN 19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Badu 43-akBadu fa 43Badu fa 43-ak

Table des Matières