3.1
Remove the Hanger Ball by loosening the Phillips Head
Set Screw in the Hanger Ball until the Ball falls freely
down the Downrod (Figure 1).
Remove the Pin from the Downrod, then remove the
Hanger Ball (Figure 1).
Retain the Pin and Hanger Ball for reinstallation in
Step 3.9.
NOTE: Do not loosen the Screw holding the Green
Ground Wire.
3.2
Separate, untwist and unkink the Two 80" Motor Wires.
Route the Two 80" Black and White Motor Wires
through the Downrod (Figure 2).
3.3
Loosen the Two Phillips Head Set Screws in the Motor
Coupler for installation of the Downrod (Figure 3).
Seat the Downrod in the Motor Coupler (Figure 3).
Rotate and align the Downrod Holes with all the Holes
in the Motor Coupler (Figure 3).
3. Ceiling Fan Assembly
PIN
PHILLIPS HEAD SET SCREW (LOOSENED)
Figure 1
TWO 80" MOTOR WIRES (UNTWISTED)
Figure 2
DOWNROD
MOTOR
COUPLER
LOOSEN
SETSCREWS
Figure 3
5
GREEN GROUND WIRE
4.5" DOWNROD
HANGER BALL
4.5" DOWNROD
luminancebrands.com
Please contact 1-800-777-4440 for further assistance
ETL Model No.: CF955L