cegard/Lift LX/LY
6.10.
Example 2 with cegard/Lift LY: Bypassed light curtain in the zone
This example shows another variant illustrating how the cegard/Lift LY can be integrated in a system. The differ-
ence to example 1 is that the light curtain is bypassed somewhat earlier. The light curtain is thus overridden 10
cm prior to the flush position in the case of an elevator with a zone of ±10 cm. This variant is recommended, as
many elevator users try to open the door while travelling slowly. This connection does not trigger an emergency
stop under the conditions described, provided the elevator is already within the floor zone.
Important safety notice:
Mains power must also be available during a safety circuit interruption. Internal call signals (Innenrufe) must also
be supplied during a safety circuit interruption
Cross reference: See section 3.3.2 for timing diagram
inside calls or
reset button
inside calls /
reset button,
reference potential
+
-
door lock signal
latch solenoid
P
power
N
supply
PE
Figure 23: Connection diagram for early override
20
to the elevator controller
i.e. slow relay
zone switch
+
-
K40
K41
K42
K43
snap-rail
www.cedes.com
Installation and Operation Manual
Diagnose
Bündigstellung
Überbrückungsverzögerung
Sicherheitskreis
Power
Servicetaste
K1
+ Notstop
K2
- Notstop
K3
Check 1 Riegel
K4
Check 2 Riegel
K5
Check 1 Sicherheitskreis
K6
Check 2 Sicherheitskreis
K7
K8
K9
K10
Innenruf 1-8
K11
K12
K13
K14
K15
Innen-Ruf Common
+ Option1
K16
- Option1
K17
+ Option2
K18
- Option2
K19
+ Bündigstellung
K20
- Bündigstellung
K21
+ Überbrückungsverzögerung
K22
- Überbrückungsverzögerung
K23
+ Riegel_in
K24
- Riegel_in
K25
K26
Riegel_out
K27
K28
Sicherheitskreis1
K29
K30
Sicherheitskreis2
K31
P
K32
N
K33
K34
Auswerteeinschub
cegard/Lift
© CEDES/October 2008