On-Wall Installation - Martin Logan CADENCE Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ON-WALL INSTALLATION

The soundbar can be mounted above or below a
television with the feedback display and rear connec-
tion panels orientated towards the bottom or top of
the soundbar (depending on your specific installation
requirements). The information shown on the sound-
bar display can be flipped to match your installation
orientation.
Note: These instructions assume the mounting
surface is standard wood frame and sheetrock
construction. If you wish to mount to another type
of surface, consult a bonded contractor.
Note: When installing the system in this configu-
ration, use the soundbar's menu system to choose
'Installation > Wall Mount'.
Required tools (not included):
• Stud finder
• Level
• Electric drill and drill bits
• Phillips screwdriver
Fig. 1
WARNING! We strongly recom-
mend locating the wall bracket so
at least one of the screw locations
attaches to a stud. WARNING!
To prevent injury, this apparatus must be secure-
ly attached to the floor/wall in accordance
with the installation instructions.
Required hardware (included):
• (1) Installation template
• (1) Wall bracket
Required hardware (not included):
• (5) Screws appropriate for mounting surface
• (5) Sheet rock anchors (sized for screws)
1 Locate mounting location using a level and the
installation template (fig. 1).
2 Mark the three central pilot hole locations and
remove the installation template (fig. 1).
9

Publicité

Chapitres

Table des Matières
loading

Table des Matières