The paraffin oil between the diaphragms (Q) is
connected via the clamping sleeves (6q) to the
contact pressure gauge (S) in order to fill and
activate the diaphragm leakage detection. The oil is
able to pass between the diaphragms through the
slits in the clamping sleeves and the slits in the
Caution
intermediate disk.
The clamping sleeves (6q) must therefore be
installed in such a way that the slits in the clamping
sleeve face the slits in the intermediate disk (3q).
See fig. 40.
10.7.3 Fitting the dosing head
Fit the dosing head and cross-tighten the dosing head screws
using a torque wrench.
See section
8. Start-up/shutdown
Note
start-up!
10.7.4 Filling the double diaphragm with separating agent
After a diaphragm has broken, the ball non-return
valve must be cleaned before the diaphragm is filled
Caution
with separating agent. Only clean the ball non-return
valve after a diaphragm breakage!
Pump with double diaphragm: After the diaphragm has been
replaced, refill the separating agent between the diaphragms.
1u
Fig. 41 Dosing head with double diaphragm
Pos.
Components
S
Contact pressure gauge
T
Ball non-return valve
U
Connection piece
1u
Filling screw
2u
Deaeration screw
1. Set the stroke-length adjustment knob of the pump to 0 %.
2. Open the filling screw (1u) and deaeration screw (2u) by one
turn.
3. Connect the filling hose to the nipple of the filling screw (1u)
and, using the dosing syringe, inject the correct amount of
paraffin oil that is specified in the table below.
4. Close the filling screw (1u), but leave the deaeration screw
(2u) open.
5. Start the pump with a system counter-pressure and
stroke-length setting of 40 %.
6. Only close the deaeration screw (2u) when the separating
agent stops flowing (after 5 to 10 minutes).
After a few operating hours, especially if the pressure
of the pressure gauge is increasing, deaerate the
Note
double diaphragm again.
34
for subsequent
S
U
2u
T
Quantity of paraffin oil required for dosing pumps with a
double diaphragm (per dosing head)
Pump type
DMH 251-253
DMH 254
DMH 255
DMH 257
For product numbers of double-diaphragm filling
Note
components, see "Service kit catalogue" on
www.grundfos.com
10.7.5 Filling with gear oil
Risk of leaking oil and damage caused by oil loss!
Caution
For each oil change, a new flat gasket (1b) must be
fitted!
1. Check that the locking screw (B) is tightened.
2. Slacken and remove the oil-filling screw (F).
3. Set the stroke-length adjustment knob (L) to "0".
4. Slowly add the hydraulic oil through the oil-filling opening (F)
until the oil reaches the mark on the oil dipstick.
5. Wait 30 minutes.
6. Let the pump run for approx. 5 minutes with a stroke-length
setting of 0 %.
7. Let the pump run for approx. 10 minutes with a stroke-length
setting of 40 %.
10.7.6 Checking the oil level
1. Switch off the pump, check the oil level and add oil, if
necessary.
2. Refit the oil-filling screw (F).
After initial start-up and after each time the
diaphragm is changed, tighten the dosing head
screws.
Caution
After approximately 6-10 operating hours or two
days, cross-tighten the dosing head screws using a
torque wrench.
Torques
Pump type
DMH 251, 10 bar
DMH 251, 16 bar
DMH 251, 25 bar
DMH 252
DMH 253
DMH 254
DMH 255
DMH 257
Filling quantity
[ml]
4
6
8
10
Torque
[Nm]
8-10
10-12
13-15
8-10
10-12
50-54
50-54
50-54