Important installation instructions:
IMPORTANT: The installation of the rope for the
traversable
system, as well as the self-pressing of end terminals and tensioning
elements may only be carried out by authorised persons trained by the manufacturer
and in possession of a corresponding training certificate! Special tools are required.
The installation of the
qualified installation personnel using the mounting materials supplied by the
manufacturer in accordance with the installation and user instructions! The installation
must be subjected to a proper inspection!
All components must be checked for completeness and integrity prior to installation.
All specified tightening torques must be applied with a tested torque wrench.
The anchor device must be installed and used in such a way that the anchorage line
does not come into contact with a sharp edge or any other objects which can damage
the guiding mechanism due to its deflection during a fall-arrest incident.
The lifeline system must be integrated into the lightning protection system (potential
equalization) according to the national lightning protection regulations. Use as an air
termination rod is not permitted!
Maximum permissible incline of the lifeline system = 15° (according to DIN EN
795:2012 Type C).
Changes of direction in the stainless steel lifeline ≥ 45° must be solely made with the
intended system components (corner protector, rope guide 90°, rope guide variable
etc.).
*)
In each lifeline system a minimum of 1 LUX-top
preserver/force absorbers must be installed
Installation must take place on a substrate with adequate load bearing capacity in
accordance with the manufacturer's specifications and on site structural strength
verification in accordance with the technical building regulations. The minimum
component dimensions and edge distances in accordance with the installation
instructions must be observed!
The load transfer into the substrate or into the on-site overall construction must be
verified on site by technical building regulations.
The installers must ensure that the substrate is suitable for fixing the anchor device.
All connections of the anchor device must be properly and conscientiously installed and
checked according to the manufacturer's specifications. This must be confirmed by the
responsible fitter on the installation documentation form attached to these instructions
for use.
*)
*)
When using the system in Germany, the information provided in the national technical approval Z-14.9-789 must be observed.
This document dictates, amongst other things, that on lifeline systems with cornering elements a SKE II must be installed on
both ends.
**)
Outside of Germany and after consultation with the manufacturer, the SKE II can be dispensed under certain
conditions for systems that are less than 25 m in length.
ST QUADRAT Fall Protection S.A. – Your competent partner for fall protection devices – www.lux-top-absturzsicherungen.de/en
LUX-top
®
FSE 2003
*)
*)
page 6 Version 09/2020
LUX-top
systems may only be carried out by
®
SKE II rope strength
*) + **)
*)
®
FSE 2003
*)