7
Final installation of side wall
STEP
Install the side wall (15). Lift the wall approximately
3 inches above the threshold of the base, push it
completely against the back wall then slide the side
wall into position.
WiPe oFF eXcess silicone
Secure the wall to the wall studs with #8 x 1¾ "
screws (not included) in the previously drilled holes.
Also, secure the wall by the fastening flanges on the
side of the wall. Use the pre-dilled holes.
if needed, use shims to keep wall plumb, square
and leveled. (cut shim excess)
iMPortant: Hand tiGHten onlY. do not
oVer-tiGHten tHe screWs.
tHe side Wall sHould line uP WitH
Quick tip
tHe Base
Check me!
Check me!
BeFore continuinG,
Validate tHat all
tHe Walls are leVel,
PluMB and sQuare
Check me!
Side wall
Base
14
3
7.1
1
7.2
7.3
Side wall
Back wall