MAAX Olympia square 4832 Guide D'installation page 12

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5
Temporary installation of the
STEP
side walls (Cont'd)
Install the side wall (15). Lift the wall approximately 3"
above the threshold of the base, push it completely
against the back wall then lower the side wall into
position.
It is critical that all 3 retraction pins
engage with the X fasteners. There
should be no gap between the walls.
The side wall should now line up
Quick tip
with the front of the base.
Place a level vertically
Quick tip
on the side wall. If the
wall is not straight,
make sure that the
retraction pins are
properly inserted in
the X fasteners.
With a 1/8" bit, drill holes in the side wall fastening flange
(15) at the top aligned with each stud. only pre-drill
the flange not the studs. Then, secure the side wall
(15) with one #8 x 1¾" screw (not included) in one of the
pre-drilled holes.
iMPortant: Hand tiGHten onlY. teMPorarY
installation.
Check me!
Side wall
Base
Check me!
BeFore continuinG,
Validate tHat all
tHe Walls are leVel,
PluMB and sQuare
3
5.4
1
15
Threshold
5.5
5.6
Check me!
12
Side wall
Back wall

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Olympia square 6032106011106012

Table des Matières