for a worry free installation follow
all instructions and check them off
as you go.
1
Building the structure
STEP
Before starting make sure to have all
parts and components refer to page 4.
Build a structure based on the dimensions in the chart
below.
iF structure is alreadY Build cHecK tHat
it resPects tHe diMensions BeloW
coMPatiBle Bases
no.
olympia square 4832
106011
olympia square 6032
106012
Verify the walls are square, plumb and the flooring is
perfectly level.
For leveling the floor use self-leveling
Quick tip
mortar.
Cut out an approximate 6" x 6" opening around
the drain center outlined by measurements C and
D. See image to the right and the chart above. We
recommend that a plumber completes the drain pipe
connection.
Check me!
a
B
c
48"
33 1/2"
16"
24"
min.
min.
60"
33 1/2"
16"
8 1/2"
min.
min.
Check me!
Leveling the floor is
critical for wall alignment
Check me!
C
B
1.1
C
B
d
1.2
1.3
6
D
A
Top view
6"
D
A
C
6"
D
6"
C
B