Installing the base (cont'd)
STEP
2.4
Check me!
If needed use wooden shims between the studs and
the fastening flange to maintain the position of the
base.
do not use sHiMs under tHe Base to leVel!
doinG so Will Void tHe MaaX WarrantY!
13
2.5
Check me!
With a 1/8" bit, drill holes in the fastening flange then
secure the base to all the wall studs with #8 x 1¾ "
screws (not included). only pre-drill the flange not
the studs.
Hand tiGHten onlY !
13
tHe BottoM oF all Holes in tHe FlanGe
HaVe to Be at least 8MM (0.3 incHes) aBoVe
tHe Base tHresHold!
cut sHiM eXcess
0.3" (8 mm)
Ø 1/8"