INSTALLATION
Specification
16.2 Wiring diagrams and terminals
7
6
5
4
85 °C
1 Operating mode switch
2 Electronic assembly with zero volt and switching relay
3 Rapid heating pushbutton
4 Temperature controller
5 Pressure switch for protective anode
6 High limit safety cut-out
7 Heating element
Heating element
1
kW
7.0
Instantaneous water cylinder mode
3.5/21 kW, 3/PE ~ 400 V
Dual circuit operation
Single-meter counting with power-OFF contact: 3.5/21 kW, 3/PE
~ 400 V
1 Power-OFF contact
26
| SHD
1
2
3
55 °C
2
4
3
7.0
3.5
3.5
1
Dual-meter measurement with power-OFF contact: 3.5/21 kW, 3/
PE ~ 400 V
1 Power-OFF contact
Single circuit operation
21 kW, 3/PE ~ 400 V
Load shedding relay LR 1-A
3
2
1
1 Load shedding relay
2 Control cable to the contactor of the second appliance
3 Control contact, opens when switching on the SHD S
1
www.stiebel-eltron.com