Fig. 6: Dry well installation
6.4.6

Level control

6.4.7

Dry-running protection

6.5

Electrical connection

6.5.1
Fuse on mains side
50
Installation and electrical connection
Work steps
1
2
1
3
2
4
5
5
3
6
4
7
8
9
4
Machine room/installation location is prepared for the installation.
Pipe system has been properly installed and is self-supporting.
1. Use a shackle to attach the lifting equipment to the attachment point of the pump.
2. Lift the pump and position it in the machine room.CAUTION! Hold the power sup-
ply cables slightly taut when positioning the pump!
3. Fasten pump to the foundation properly.
4. Connect pump to the pipe system. NOTICE! Ensure the connection is free of
stress and vibrations. If required, use plastic connection pieces (compensators).
5. Loosen the lifting gear from the pump.
6. Have the power supply cables installed in the machine room by a qualified electri-
cian.
▶ The pump is installed, the qualified electrician can make the electrical connection.
With a level control device, the current fill levels are determined and the pump is
switched on and off automatically depending on the fill levels. Fill levels are recorded by
using different sensor types (float switches, pressure and ultrasound measurements or
electrodes). The following must be observed when using a level control device:
▪ Float switches can move freely!
▪ The water level must not fall below the minimum permissible!
▪ The maximum switching frequency must not be exceeded!
▪ If the fill levels fluctuate strongly, a level control with two measuring points is recom-
mended. This makes it possible to achieve larger differential gaps.
Dry-running protection must prevent the pump from operating without fluid and air
from entering the hydraulics. The minimum permissible fill level must be determined
with the help of a signal transmitter. Once the specified limit value is reached, the pump
must be deactivated with an appropriate signal. Dry-running protection can expand the
available level controls by an additional measuring point or function as an independent
switch-off device. Depending on the system security, the pump can be restarted auto-
matically or manually. Installation of dry-running protection is recommended for op-
timum operational reliability.
DANGER
Risk of death due to electrocution!
Improper conduct when carrying out electrical work can lead to death due to electric
shock! Electrical work must be carried out by a qualified electrician in accordance
with the locally applicable regulations.
▪ The mains connection must match the specifications on the rating plate.
▪ Power supply on mains side for three-phase current motors with clockwise rotating
field.
▪ Lay the power supply cables in accordance with the locally applicable regulations and
connect them according to the wire assignment.
▪ Connect the monitoring devices and check their function.
▪ Earth the device properly in accordance with applicable local regulations.
Pressure pipe
Gate valve pressure side
Non-return valve
Compensator
Gate valve suction side
Inlet pipe
Signal transmitter for level measurement
Collecting space
Machine room
WILO SE 2018-02

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Emu f-motor

Table des Matières