8. STARTUP
The electronic regulation set is very important for energy saving. It is compulsory that the first commissioning is always done by qualified engineer during
the start-up. At the same time, in order to guarantee an optimal performance, the boiler and its components have to be received in situ by an authorised
EN
specialised technician.
Before connecting the boiler to the mains power, you need to check every point of the following list:
Assembly instructions observation:
-
Has every assembly step been properly done according to the instructions?
Ashtray control:
-
Check we do not find foreign bodies inside the burner. While the boiler is running, no part or component
should be inside the burner or in the hopper. Closes the door and check that it closes perfectly.
Burner
-
It must be checked that the burner is correctly positioned and completely clean.
-
Plug in
Once all these points have been checked, please connect the power lead to a grounded socket of ~230V/ 10A
using a slow blow fuse.
You need to take into account the following points:
•
The system must have been run according to the rule VDE 0100.
•
The connection to the electric power network should not be done through an extension lead (fire risk!)
•
It is recommended to install an automatic switch.
•
Compare the machine nameplate data with the data calculated from your power network.
9. DISPLAY
9.1
GENERAL DISPLAY INFORMATION
The display shows information about the operation of the boiler. In the main screen we can see the hour, date, activation of the chrono, working power,
operating status, error/alarm code, temperature of the water in the boiler, water boiler thermostat.
This model of touch screen display allows you to move through the different menus by sliding your finger on the screen.
The symbols next to the icons indicate the possibility of moving both horizontally and vertically between the screens.
The following drawing shows an example of the information that the display shows on the first page of the main screen:
38
-
Combustion chamber control
Please check that there are no objects inside the combustion chamber
and place inside the chamber the appropriate burner. An incorrect
placement of the burner may cause some problems during lighting and
combustion.
-
Placing the baffle plate
Inside the fuel store (hopper) you will find the boiler baffle-plate. This piece must be placed on the top side of the
combustion chamber in order to the well work of the boiler.
Chrono active
P1
Pl Man
P2
Pellet 1
P3
Operating
status
Date and hour
Error code
Fri 18:35
Err 18
Ignition
63º
75º
Main
Main
temperature
thermostat
P4
P5
P6