INSTALLING THE HOOD MOUNTING BRACKET
WARNING
:
WHEN CUTTING OR DRILLING INTO WALL, DO NOT DAMAGE ELECTRICAL WIRING AND OTHER HIDDEN UTILITIES.
WHEN BUILDING FRAMEWORK, ALWAYS FOLLOW ALL APPLICABLE CONSTRUCTION CODES AND STANDARDS.
To construct wood wall framing that is flush with surface of wall studs, ensure t hat:
a) The framing is centered over installation location and is sturdy enough to support the
weight of the hood.
b) The height of the framing will allow the mounting bracket to be secured to the framing
within the dimensions shown.
After wall surface is finished, carefully center and level the hood mounting bracket, secure it to wall
framing with three 4 x 16 mm mounting screws (that are provided). Tighten the screws c ompletely.
IMPORTANT: Make sure that holes locations are leveled and correctly centered by the vertical centerline
(this installation instruction applies also for concrete wall).
WARNING: TWO (2) PEOPLE ARE REQUIRED TO LIFT AND POSITION THE HOOD ONTO THE MOUNTING
SCREWS.
INSTALLING UPPER CHIMNEY MOUNTING BRACKET
Center the bracket over the hood location and place it flush with the
wall.
Make sure that the slots of the upper chimney are installed
horizontally and level.
Use the upper chimney mounting bracket as a template to mark the
position of its screws.
Drill both screw holes using a 5/16" drill bit. Insert
anchors (included) into the drilled holes (one per hole).
Secure the upper chimney bracket to the wall using two 3 x 16 mm
mounting screws. Make sure that the bracket is tight against the wall.
WARNING
BE CAREFUL WHEN INSTALLING THE DECORATIVE CHIMNEY AND HOOD, THEY MAY HAVE SHARP EDGES.
WE RECOMMEND THAT YOU WEAR PROTECTION GLOVES.
CAUTION
DO NOT REMOVE THE PROTECTIVE PLASTIC FILM COVERING THE DECORATIVE CHIMNEY AT THIS STAGE.
the
drywall
28