Tunturi Platinum PRO Mode D'emploi page 6

Masquer les pouces Voir aussi pour Platinum PRO:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5. Install the two mounting brackets
(17) in the middle of the rails with
two 5/16" flat washers (133) and two
5/16" x 3/4" socket hex head bolts
(75). Install two mounting brackets
(26) at the front of the rails with two
5/16" x 3/4"socket hex head bolts
(75). Install the two steel covers (15
right & 16 left) by lifting the pedal
tubes so the wheels are off the tracks
then slide the pedal tubes, wheels
first, through the opening of the
steel cover. Align the cover with the
6
mounting brackets and secure them
with eight M5 x 12 mm Phillips head
screws (77). Install the four small
covers (2 x #19 & 2 x #20) with ten
M5 x 12mm Phillips head screws
(77).
6. Install the centre aluminium step rail
(72) with two 3/8" curve washers
(130), and 3/8" hex socket cap
screws (129) at the rear and two
3/8" flat washers (131) and 3/8" hex
socket cap screws (128)at the front.
Install the two support tube covers
(67 left & 68 right) with two M5 x
12mm Phillips head screws (77).

Publicité

Table des Matières
loading

Table des Matières