1.1.qUICK INSTaLLaTION
This part contains the minimum information for the set-up of the LEDI Network ITS
Network DCLS
and LEDI Network NTP Server
®
part 1.3.
1.1.1. Check the package content
The package must contains the following items:
The product itself: a 19" 1U rack.
►
The name of this product is LEDI NETWORK ITS or DCLS or NTP SERvER
which is written on the front side of the rack.
►
The code and configuration of the product can be checked on the identification
stamp put on top or backside of the product. It must be 92114/opt or 92117/opt
or 92100/opt (where opt depends on the product options).
A power supply cable (only for 220V AC and 115V AC versions).
A 3 pins connector for DC power input.
A network cable.
A CDROM that contains set-up and management tools.
☛
Contact your dealer if one of the items above isn't in the package
70
. You can found additional information in
®
MDE-LEDInetworkITS-server-4078V1.3
, LEDI
®