en
30 | WBE 5210 | Commissioning
4.
Commissioning
4.1
Unpacking
1. Remove the steel bands and fasteners.
2. Carefully lift off the packaging.
3. Remove the wheel guard, accessories and packaging
material from the packaging unit.
i
Check that the WBE 5210 and the accessories are in
proper working order and that there are no visible
signs of component damage. In case of doubt, do
not start up the unit and consult customer service.
i
Remove the accessories and packaging material from
the packaging unit.
4.2
Set-up
1. Slacken off the bolts with which the WBE 5210 is
attached to the pallet.
WARNING – Defective or incorrectly at-
tached lifting straps!
Risk of injury due to WBE 5210 falling down.
Check lifting straps for physical damage
before attaching.
Tighten lifting straps uniformly.
Lift WBE 5210 carefully.
2. Attach lifting straps of equal length and with an ade-
quate loadbearing capacity (at least 100 kg)
as shown.
|
1 695 654 697
2010-11-19
3. Use a crane to lift the WBE 5210. Set up the unit in
the intended area, paying attention to the specified
minimum distances.
i
For safe and ergonomical operation, it is advisable to
set up the WBE 5210 at a distance of 500 mm from
the nearest wall.
4. Fasten the WBE 5210 to the floor at a minimum of 3
points.
Robert Bosch GmbH