On-Site Connections; Plumbing Connections On The Machine - Miele professional PW 6107 Mode D'emploi

Masquer les pouces Voir aussi pour PW 6107:
Table des Matières

Publicité

Installation and connection

On-site connections

WW Hot water
KW Cold water
KWHHot and cold hard water
EL Electrical connection
AG Exhaust gas (gas heated machines only)
G
Gas connection (gas heated machines only)
AV Drain
Steam connection (steam heated machines)
D
K
Condensate drain (steam heated machines)

Plumbing connections on the machine

Cold water
Hard water
Liquid dispensers
Plumbing
Connection must be made to the water supply via a
faucet which conforms to local and national
regulations. This work must be carried out by an
authorised person in strict accordance with local and
national regulations.
34
Hot water
Cold water
Hard water
Water inlet / drainage
To ensure trouble free operation of the machine, the
flow pressure must be at least 100 kPa (14.5 psi) and
not exceed 1000 kPa (145 psi).
The inlet pressure tested hoses supplied with the
machine must be used for connection to the water
supply.
If replacing an inlet hose only use a hose tested to at
least 7000 kPa (1,015 psi) pressure, and for a water
temperature of at least 90 °C.
This also applies to all fittings. Genuine Miele original
parts fulfil these requirements.
Water taken into the machine must not exceed a
temperature of 70°C.

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Pw 6137Pw 6167Pw 6207

Table des Matières