On-site connections

WW Hot water
KW Cold water
KWH Hot Cold Hard water
EL Electrical connection
AG Gas (gas heated models)
G
Gas supply (gas heated models)
AV Drainage
Steam port (steam heated models)
D
K
Condensation vent (steam heated models)

Water connections

Cold water
Hard water
Liquid dispensing

Plumbing

The machine should be connected to two water
supply faucets, which conform with local and national
regulations. Installation must be carried out by an
authorized service technician.
To ensure the machine is correctly connected please
follow the installation plan and the installation
instructions supplied with the machine.
Warm water
Cold water
Hard water
Installation Instructions
Connecting the water intake / water drain
hoses
A water pressure flow rate of at least 14.5 psi, maximum
145 psi is required.
The inlet pressure hoses supplied with the machine
must be used for connection to the water supply.
If replacing an inlet hose only use a hose tested to at
least 1015 psi pressure, and for a water temperature
of at least 194°F (90 °C). This also applies to all
fittings. Miele original parts fulfill these requirements.
The hot water intake must not exceed a temperature
of 158°F (70°C).