P/N 0487074G
INSTALLING SPLASHGUARDS &
LOWER FRONT PANELS
The splashguard and lower front panel are
shipped inside each merchandiser. A
chandisers have been leveled and joined, and all
drip piping, electrical and refrigeration work has
been completed, install the splashguard and lower
front panel.
NOTE: Merchandisers with low bases do not
have lower front panels and require only the
installation of splashguards.
To Install Splashguards:
1. Check to be sure that all splashguard brackets
are level with the floor.
2. Position top of splashguard over the top edge
of the bracket as shown below.
3. Push the lower edge of the splashguard
toward the bottom of the bracket until it snaps
into place.
To Install Lower Front Panel
1. Position the lower front panel with the top
angled as shown in the illustration below.
2. The tabs extending from the upper front panel
assembly are designed to fit into the slots on
the top of the lower front panel.
3. Once the top is positioned, lift the panel up
and drop it into the grove at the top of the
splashguard.
SEALING SPLASHGUARD TO FLOOR
I
by local sanitation codes, or if
F REQUIRED
desired by the customer, plastic splashguards may
be sealed to the floor using silicone type sealer.
The amount needed will depend on how much
the floor is out of level.
1. Remove all dirt, wax and grease from the area
of the splashguard where adhesion will be
necessary to ensure a secure installation.
2. Apply a good silicone type sealer along the
bottom of the splashguard. Sealant must be
removed and replaced when servicing.
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
mer-
FTER
Splashguard
Silicone-type
Sealer
1.
Bracket
2.
Splashguard
3.
Splashguard
1. &
2.
Tab
Lower Front Panel
3.
Lower Front Panel
Lower Front Panel
Bracket
Medium Temperature
3-3
Base of
Case
Base of
Case