Transport And Unpacking; Installation Conditions And Dimensional Sketches - Zehnder ComfoAir XL Manuel De L'installateur

Masquer les pouces Voir aussi pour ComfoAir XL:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 49

2 Transport and unpacking

The bottom of the ComfoAir must be supported
during transport. When using a fork lift truck,
make sure the forks are slid completely under the
ComfoAir, in order to avoid denting the housing.
Check whether access to the area is not obstructed
by excessively small passages etc.
Take care when transporting and unpacking the
ComfoAir.
Make sure the packing material is disposed
of in an environmentally friendly manner.
Checking delivery
Contact your supplier immediately in case of damage
or an incomplete delivery.
The delivery should include:
■ ComfoAir; Check the identification plate to ensure
that it is the required type;
■ Installer manual;
■ Software manual;
■ Technical specification sheets;
■ Seal cap, seal plug, cable feed in packaging;
■ Hoisting instructions (attached to the operating
side).
The ComfoAir is supplied in the following sizes:
ComfoAir XL Eco 800 CFE
ComfoAir XL Eco 1500 CFE
ComfoAir XL Eco 2200 CFE
Meaning of the suffixes:
ComfoAir XL Eco = Product family name
800
= Product type name (Air volumes in m3/h)
CFE
= Counterflow plate exchanger
R
= Right-hand version
L
= Left-hand version
PF
= Flat Filter
BF
= Bag Filter
O
= Outdoor version
I
= Indoor version
(PRH)
= Room for a preheater
PRH
= Preheater fitted as standard
(POH)
= Room for a postheater
POH
= Postheater fitted as standard
(CL)
= Room for a cooler
CL
= Cooler fitted as standard
(DMP-ODA)
= Room for an outer valve outside air
DMP-ODA
= Outer valve outside air fitted as standard
(DMP-EHA)
= Room for an outer valve exhaust air
DMP-EHA
= Outer valve exhaust air fitted as standard
ComfoAir XL Eco 3300 CFE
ComfoAir XL Eco 4400 CFE
ComfoAir XL Eco 6000 CFE
3 Installation conditions and
dimensional sketches
In order to determine whether the ComfoAir can be
installed in a certain location, the following aspects
must be taken into account:
■ Check whether the admissible load (kg/m 2 ) of the
roof or floor is sufficient to bear the given weight
of the ComfoAir;
■ The system must be fitted to allow sufficient room
around the ComfoAir for the air connections as
well as for carrying out maintenance activities;
To ensure components can be replaced, at
least one casing's width of free space is
required.
■ The space must have the following facilities:
- Air duct connections;
- Electrical connection;
- Facilities for a frost-free condensation drain;
- Facilities for battery or batteries.
■ The condensation must be drained off frost-free,
at a gradient, using a siphon;
■ Take care of acoustic shields.
Dimension sketch
The ComfoAir dimension sketch is located between
the technical specification sheets.
EN - 21

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Comfoair ecoComfoair xl eco

Table des Matières