Installation; Installation Of The Indoor Unit; Clearance; Unit Location - SystemAir CONDENSATION PAR AIR 2450 Manuel D'installation Et De Maintenance

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION

The unit is not designed to withstand weights or stresses from adjacent equipment, pipe work or
constructions. Any foreign weight or stress on the unit structure could lead to a malfunction or a
collapse with dangerous consequences for personnel and property. In such an event, the warranty
shall be null and void.

INSTALLATION OF THE INDOOR UNIT

CLEARANCE

1. on the connection side
2. for total rear air intake
3. for front air discharge with plenum accessory
4. for direct vertical air discharge
RESPECT MINIMUM CLEARANCES SPECIFIED AROUND THE UNIT.

UNIT LOCATION

The unit base shall be arranged as indicated in the manual. There could be a risk of personal injury
or damage to property in the event of the unit being incorrectly supported.
The unit must be installed on a firm level foundation, of adequate strength to support its full operating weight.
1. It must be high enough to permit good drainage of condensates with siphon
2. The unit must be pitched slightly towards condensate drain outlet to provide positive drainage of
condensates.
3. Keep duct connections to a minimum to reduce duct losses.
4. When locating unit give consideration to, and locate unit as remote as possible minimise noise.
5. All electrical and ductwork connections to the unit must be made via flexible connections to prevent
transmission of vibration.
6. In addition to the service clearances noted on the dimension sheet it is essential that provision is
made for adequate and safe service access.
1
3
9
4
2
1

Publicité

Table des Matières
loading

Table des Matières