Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

Connecting the Components

Use the following procedure as a guideline for making the
connections between the components of the remote shelf
system. These connections must be made by trained and
qualified installers and must comply with all local plumbing and
electrical codes. Refer to the SPECIFICATIONS section and
the wiring diagram included with the unit for details regarding
the plumbing and electrical connections.
1. Connect the liquid and suction refrigerant lines between
the condensing unit, the TXV valve, and the refrigerated
evaporator coil. Refer to the appropriate illustration below
and the SPECIFICATIONS section for connection details.
NOTE: The maximum refrigerant line length between the
condensing unit and the evaporator coil is 50 feet (15 m).
NOTE: For refrigerant line connections, use a self-fluxing
brazing compound (example = Sil-Fos 5
temperature range of 1300–1500°F (704–816°C).
(to condensing unit on "R" Models or
solenoid valve on "X" Models)
) at a brazing
®
POWER HOT Terminal Block
Digital Temperature Controller
Power Output
(to shelf conduit)
Temperature Probe
Wires Inlet
Power Output
Power Input
Access Cover
Control Panel Connections
Liquid Connection
(1/4" O.D. tube)
Remote Hot/Cold Shelf Refrigerant Connections
(HCSBFR, HCSSBR, and HCSSBFR Models)
POWER OUT Terminal Block
POWER IN Terminal Block
18
English
Shelf
TXV Bulb
TXV Valve
Condensing
Unit
Suction Connection
(3/8" O.D. tube)
Digital Temperature
Controller
Form No. HCSRM-0817

Publicité

Chapitres

Table des Matières
loading

Table des Matières