If an acoustic signal would be inappropriate at the installation
site in question, an alarm signal can be relayed via the poten-
tial-free contact. The maximum load for the change-over con-
tact of the collective error is 3 A, 250 V AC.
OPERATION
The operator of the system must ensure that all accident pre-
vention regulations (VBG 16 in Germany) applicable for the sys-
tem are adhered to by operating and maintenance personnel.
Please also observe any relevant advice given in the compres-
sor manual.
Before using for the first time, the transport securing devices
must be removed from the compressor.
Check the oil level in the compressor and lock the castors.
Automatic operation
Automatic operation is the normal operating mode of the unit.
The flushing time and flushing intervals depend upon the di-
ameter of the wastewater pipe and the system pressure.
Manual operation
"Handmodus" can be selected in the main menu of the con-
trol. In this mode, individual components and functions can be
switched on and off.
Shutting down
In manual mode, all components can be made "inactive", but
they are still connected to the power supply.
WARNING!
Before carrying out any repair and maintenance work on the
system, the system must be disconnected from the power sup-
ply (main switch). It is not sufficient to just switch it to an "inac-
tive" state.
Inspection
To maintain operational reliability, carry out a visual inspection
of the unit, including the pipe connections, once a month.
MAINTENANCE
WARNING!
Before carrying out any work, pull out the mains plug and en-
sure that the power supply to the unit cannot be switched on
again by anyone else.
WARNING!
Check the plug and the mains cable for signs of mechanical
and chemical damage. Damaged or kinked hoses must be re-
placed by the manufacturer.
Non-return valves in the compressor unit must be replaced
every 2 years.
The system must be serviced once a year. It is important that
the servicing intervals for the compressor (as specified in the
compressor manual) are adhered to.
To ensure continued reliability of service, we recommend that
you take out a service contract.
CONTROL
The system is configured via the control display.
The menu items, settings and values are selected with the "ar-
row buttons" ▲ ▼ and confirmed by pressing the -OK- button.
Use the -ESC- button to exit the menu.
First use
When using for the first time, and after a reset, the time and
date must be set.
Language. The standard language is German. The arrow but-
tons can be used to switch to English, French, Dutch, Swedish
or Polish. Pressing -OK- confirms the selection.
Time. Each flashing digit must be selected with the arrow but-
ton and confirmed with -OK-. Once the full time has been set,
a "Time OK?" query follows. Confirm with -OK- or return with
-ESC-.
Date. Each flashing digit must be selected with the arrow but-
ton and confirmed with -OK-. The day of the week is set auto-
matically. Once the full date has been set, a "Date OK?" query
follows. Confirm with -OK- or return with -ESC-.
Standard display
PPCSZ
20:50
Pipe1 40 06.04
1st line
PPCST - PPCS with fixed time
PPCS - Pump control (volume-dependent)
PPCSA - After run (after every pumping operation)
PSV - Pump sump ventilation
PPV - Pressure pipe ventilation
x - Blocked (by pump or temperature)
2nd line
Pipe1 40 - Pipe 1, 40 minutes until it starts
PSV 0132s –132 seconds until PSV cycle starts
Factory default setting
Fixed times: 8.00hrs and 21.30hrs with 5 minutes run-time.
Current data.
By pressing -OK- you can read off the operating hours of the
pressure pipe cleaning system (PPCS) and the pressure pipe
ventilation (PPV), the last starting time, temperature, current
consumption, operation of the system, and software.