Manual Dismantling And Descaling Of The Cell - Procopi Label Bleu ESS Notice D'installation Et Conseils D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

MANUAL DISMANTLING AND DESCALING OF THE CELL:

If iltration is topped, force it on for approximately
1.
one minute so that water lows through the cell in
case acid was just injected.
2.
Isolate the by-pass loop on which the cell is
mounted by completely closing the shut-off
valves at the loop inlet and outlet.
3.
Disconnect the quick connectors of the cell
power cables.
4.
Unscrew the white barrel unions on either end of
the cell, and remove the cell.
5.
Screw the white blanking cap onto one of the
cell openings, irst making sure that the o-ring is
correctly positioned.
6.
Turn the cell the other way round and stand it
vertically on the white cap.
7.
Pour white distilled vinegar or 10% Hydrochloric
acid into the cell.
Wait until the scale is completely dissolved (stops
8.
WINTERIZING
A) PASSIVE WINTERIZING:
In the event that pool iltration is completely stopped
during the winder, proceed as follows to avoid any
damage that could be cause by freezing or clogging
PH-CLEAR PUMP:
Rinse the pump tubing as follows to remove any
traces of acid:
Pull the suction tube and strainer carefully
out of the acid buffer tank and immerse it into a
bucket of water.
run the pump either in pH Reducing - Manual
mode if iltration is running, or in Cell Cleaning
Manual mode if iltration is stopped.
CELL:
Descale and clean the cell (ref VIII.5), either
using the pH-Clear pump before it is winterized,
or manually after dismantling the cell (ref. X.5) ;
Open the bottom union to drain water from the
PROBES
Cut the power supply to the electrical/ control
panel;
Disconnect the probes from the electrical/ control
panel;
Close the shut-off valve on the by-pass loop on
which the probes are mounted;
52/84
2015/02 - Indice de révision : B - Code : 29650
frothing),
9.
If scale is still present, empty the cell and repeat
the procedure with vinegar or acid.
10.
Rinse the cell with water.
11.
Make sure that the o-rings are in position
at either end of the cell and remount it. Put the
installation back into operational status (cell
power cable, by-pass, valves, iltration timer)
with algae:
Close the two shut-off valves on the by-pass loop
on which the cell and pH-Clear pump are mounted.
When at least half of the bottle has been
emptied, stop the pump.
Disconnect the acid suction tube from the blue
connector on the pump.
Remove the transparent splash guard.
Carefully disconnect the acid injection tube from
the injection nipple and allow water from the
pumping circuit to empty into a bucket placed
below.
cell, then screw the union shut ;
Unscrew the blue head of the low detector and
remove it.
remove the probes and place them in their phials
of buffer solution and store them in an area
protected against freezing.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Label bleu ess pro

Table des Matières