INSTALLATION OF THE PH-CLEAR PUMP:

The pH-Clear pump should be installed downstream,
just after the cell and ideally on a vertical section of
pipe.
During the cell descaling process (iltration
stopped), the concentrated acid, being heavier
than water, will descend into the cell.
The acid injec37ion tubing is already in place, the
end piece inserted into the pipe on which the pump
is mounted.
The suction tube should be connected to the blue
port on the pump as follows:
Pull sharply on the tube to ensure that it is
locked correctly in position.
The other end of the tubing should be positioned at
the bottom of the container or tank holding the acid.
It should not be possible to remove the tubing
WHEN STARTING UP FOR THE FIRST TIME:
run the pH-Clear pump in MANUAL mode until
the pump is primed.
Check the entire circuit for leaks from suction

INSTALLING THE PROBES:

The probes are mounted on the same tee, diameter
63 mm.

REDOX PROBE:

After removing the soft protective cap (which should
be kept to winterize the probe), insert the threaded
end of the probe into the tapped port taking care
simply by pulling on it.
The container of acid should be stable and out
of the reach of children.
Place the transparent splash guard over the
pump.
from the tank to injection into the pool's hydraulic
circuit.
not to twist the ilament, use Telon and tighten the
probe to achieve a leaktight seal.
2015/02 - Indice de révision : B - Code : 29650
Push the shiny black tube
in fully, then retighten the
nut.