Dismantling The Module; Other Possible Uses Of The Connecting Module, - Right-Hand; Mounting The Valve Block - Burkert MP07 Instructions De Service

Blocs multiples et profil pneumatique modulaire
Masquer les pouces Voir aussi pour MP07:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Secure the valves to the base module using 2 M4 screws each.
(Tightening torque max. 1.5 Nm).
Mount the complete valve block onto the wall or the standard rail.
Connect the supply and working lines.
Make the electrical connections to the pilot valves: in doing this, observe the values given on the rating
plate!

Dismantling the module

Unlatch both locking hooks by using a screwdriver on the end dismantling-grooves.
Remove the block part / module sideways.

Other possible uses of the connecting module, - right-hand -

• As a separation module for special applications when building up several pressure levels in a single
block
• Additional supply lines for larger valve blocks.

Mounting the valve block

Standard rails
• Standard rail 35 x 15 DIN 50022 (Standard)
• Standard rail 75 x 25 DIN 50023
NOTE
When using the 75 x 25 DIN 50023 standard rail, change over the pre-assembled
screws with clamps and springs as necessary.
Installation
Hang the valve block onto the upper groove of the standard rail.
Latch the lower clamp into the standard rail.
Firmly tighten the screws on the clamp.
Dismounting
Loosen the clamping screws (by about 4 revolutions).
Remove the block upwards from the standard rail.
I
, I
NSTALLATION
NITIALISATION AND
S
ERVICE
6516 / 6517 - 13

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

65166517

Table des Matières