WATER CONNECTIONS

7.
Water connections
NOTICE: Excessive heat from soldering on copper pipes
!
near the tempra may cause damage.
The cold water connection to the unit must be discon-
nected periodically in order to clean the fi lter screen.
It is required to use water connections that are easily
detachable such as braided steel fl ex connectors.
NOTICE: Hard water or water with a high mineral
!
count may damage the unit. Damage to the unit caused
by scale or a high mineral count is not covered under
the warranty.
1. All plumbing work must comply with national and applicable
state and local plumbing codes.
2. A pressure reducing valve must be installed if the cold water
supply pressure exceeds 150 PSI (10 bar).
3. Make certain that the cold water supply line has been fl ushed
to remove any scale and dirt.
he Tempra unit has a built in fi lter screen
4. T
1
cleaned from time to time. Clean screen and put the screen
and the washer
2
back into their original position.
3
4
5
6
7
8
9
10
1
11
12
2
13
14
3
15
5. The cold water connection (inlet) is on the right side of the
unit, and the hot water connection (outlet) is on the left side
16
of the unit.
4
17
18
NOTICE: Tankless water heaters such as the TEMPRA
!
are not required to be equipped with a pressure and
5
19
temperature relief valve (P&T). If the local inspector
20
will not pass the installation without a P&T, it should
6
21
be installed on the hot water outlet side of the unit.
22
6. The Tempra on the hot side is designed for connection to
copper
23
7
tubing, PEX tubing or a braided stainless steel hose with a
24
3/4" NPT female tapered thread.
8
The plumbing on the cold water inlet side needs to be such
that
9
it can easily be removed to allow access to the inlet fi lter
screen.
The easiest way to achieve this is to us a stainless steel
10
braided hose connector.
If soldering near the unit is necessary, please direct the
11
fl ame away from the housing of the unit in order to avoid
damage.
12
7. When all plumbing work is completed, check for leaks and
take corrective action before proceeding.
13
6
| TEMPRA & TEMPRA PLUS
8.
The Tempra should be connected to properly grounded dedicated
branch circuits of proper voltage rating. Ground must be brought
to the "Ground" at the circuit breaker panel.
8.1
1
that should be
8.1.1 Tempra 12 B / Tempra 12 Plus
2
3
4
5
6
7
8
9
10
11
12
13
14
1
15
16
2
17
3
18
19
4
20
21
5
22
23
6
24
7
8
9
10
Tempra 12 B/Plus: These units can be connected to a single circuit. Use
11
a supply cable protected by a double pole breaker.
12
13

Electrical connection

WARNING: Before beginning any work on the electric
!
installation, be sure that main breaker panel switch-
es are "off" to avoid any danger of electric shock. All
mounting and plumbing must be completed before
proceeding with electrical hook-up. Where required
by local, state or national electrical codes the circuits
should be equipped with a "ground fault interrupter".
The unit must be properly grounded in accordance
with state and local codes, or in absence of such
codes, in accordance with national electric code or the
Canadian electric code. Failure to electrically ground
the product could result in serious personal injury or
death.

Circuit Layout

CKT 1
WWW.STIEBEL-ELTRON-USA.COM

Publicité

Table des Matières
loading

Table des Matières