Installation; Operation; Water Supply - Conti CC100 Notice Technique

Masquer les pouces Voir aussi pour CC100:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

16. INSTALLATION

The installation should be carried out by a qualified technician.
A water softener has to be installed when the hardness of the water supply is superior to 10° th (or
6° gh = 6° dh). The water softener has to be regenera ted at regular intervals (2 weeks).
A water cut-off valve and a standardised electrical circuit protection in accordance with the
voltage and the installed power must be installed.
The water supply pipe has to be connected to the barbed nipple 3/8" at the pump head inlet. The
drain pipe has to be connected to the drain collector and must always allow the outflow.
THE PROTECTIONS MUST COMPLY TO THE DOMESTIC STANDARDS WHERE THE MACHINE IS
INSTALLED AND ARE AT THE CUSTOMER'S RESPONSABILITY AND CHARGE.
When the machine is not operating, the water cut-off valve has to be closed and the electrical
power supply cut.
I
T IS IMPERATIVE THAT THE ELECTRICAL SUPPLY IS SHUT OFF DURING THE SERVICE ON THE
.
MACHINE
NOTE:
WHEN THE MACHINE IS NOT SUPERVISED IT MUST BE DISCONNECTED FROM THE
POWER AND WATER SUPPLY.
IT IS FUNDAMENTAL THAT THE MACHINE IS EARTHED BY THE TERMINAL PLUG.
NEVER DISCONNECT THE EARTHING WHEN THE MACHINE IS CONNECTED TO THE
POWER SUPPLY.
MEANS FOR DISCONNECTION FROM THE SUPPLY HAVING A CONTACT SEPARATION
OF AT LEAST 3 MM IN ALL POLES SHALL BE INCORPORATED IN THE FIXED WIRING
ACCORDING TO THE WIRING RULES.

17. OPERATION

WATER SUPPLY

Open the water supply tap and the water cut-off valve. Do not connect the electrical connection.
A. FIRST FILLING
Switch the machine on in pressing ON/OFF switch
"C" (located below the front panel near of the right
steam tap V2). The blue lights of the keys light up
and the automatic filling up of the boiler starts. The
machine does not heat. When water reaches the level
probe, the automatic heating of the boiler will start.
B. NEXT FILLING
The boiler will be automatically filled as long as hot
water and steam are drawn (level probe)
SACOME, CONFIDENTIAL Document,
Edition 07/2010 - CC100 DISPLAY
NOTES TECHNIQUES - TECHNICAL DOCUMENTS - page 25
it is forbidden to duplicate or communicate this document without previous authorization.

Hide quick links:

Publicité

Table des Matières
loading

Table des Matières