Line Connector; Start-Up; Safety Instructions - Burkert PTB 01 ATEX 2101 Manuel D'utilisation

Masquer les pouces Voir aussi pour PTB 01 ATEX 2101:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PTB 01 ATEX 2101
4.
Seal
PTFE.
5.
Screw in pipelines
Observe direction of flow!
6.
Install / remove.
NOTE!
Information for devices with connecting cable:
Connecting cable and coil are encapsulated. They must not be
removed!
Always connect protective conductor!
7.
Connect to power supply.
7.3.

Line connector

• PE28, PE30, PD89 and PD94: via flat plug by means of device
socket type 2508 in accordance with DIN EN 175301-803,
shape A.
• PE29, PE31, PD93 and PD95: on the molded cable.

Start-up

8.
START-UP
8.1.

Safety instructions

WARNING!
Risk of injury from improper operation!
Improper operation may result in injuries as well as damage to the
device and the area around it.
• Before start-up, ensure that the operating personnel are familiar
with and completely understand the contents of the operating
instructions.
• Observe the safety instructions and intended use.
• Only adequately trained personnel may start up the equipment/
the device.
8.2.
Start-up
Before starting up the device, ensure that:
• the device has been installed correctly,
• the connection has been made properly,
• the device is not damaged,
• all screws have been tightened.
• fit cable bushing according to the operating instructions for the
device.
english
13

Publicité

Table des Matières
loading

Table des Matières