Annual Maintenance; Five-Year General Inspection - ACO Eco-Jet Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 68

5.3 Annual Maintenance

Inspections (after emptying and cleaning have been carried out) by a qualified person:
Check the functioning of the disposal pump.
Remove the filter sieve on the intake connection for the HD pump and clean it.
Check the functioning of the HD pump and the HD cleaning head.
Check the HD pump oil level,
Hose connection between the pneumatic box and the measuring tube for tank empty:
check the tank empty hose for a free flow, and blow through if necessary.
Check the tank empty measuring tube (air bubbling pipe), in particular the opening of the
pipe in the tank for dirt and cross-section constrictions, clean if necessary.
Check the empty tank pneumatic box: the smallest-size processor and the circuit breaker
are fastened separately in a box on the pilot tube. If the air bubbling system is impaired,
functional disorders may occur in the disposal pump.
Check the functioning of the smallest-size compressor and the circuit breaker: the circuit
breaker switching points are set at the factory and may be adjusted.
Check the inspection glass: tighten the outer thread screw if there are any leaks. If fluid
continues to leak out, the unit will need to be replaced.
Check the interior wall surfaces of the grease separator, in particular in the case of
metallic materials, for corrosion in the area of the three-phase boundary (layers of water,
grease and air).
Check the functioning of electric component installations, e.g. disposal pump.
Check the functioning of the suction equipment and the free outlow of the fresh water
filling unit in accordance with EN 1717. Clean the outlet of the drinking water filling unit.
Check the inspection door(s) and in particular the condition and sealing capacity of the
gasket(s).

5.4 Five-year General Inspection

Inspections (after emptying and cleaning have been carried out) by a competent person
before initial operation and then at the latest every five years:
Check measurement of grease separator system.
Check the structural condition and the tightness of the grease separator system
according to DIN 4040-100.
Check the condition of the interior wall surfaces, the built-in components and the
electrical installations.
Check the proper execution of the grease separation system ventilation pipe als a
ventilation pipe on the roof in accordance with EN 1825-2.
Check the entries in the operating log book for completeness and plausibility, e.g.
evidence of proper disposal, and ingredients and samples taken.
Check for a complete set of required approvals and documents, e.g. authorisations,
drainage plans, instructions for use and maintenance.
Regular Inspection and Maintenance
section 4.1 "Initial operation".
Grease Separator
63

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

HydrojetLipurexLipurat

Table des Matières