Grease Separator
Operation
4 Operation
4.1 Initial Operation
A general inspection carried out by a competent person is mandatory for initial operation,
section 1.5 „Qualification of Persons".
Cut off the rubber protruding from the
Î
lid (cover plate) for ventilating the oil
container.
Check the oil level of the HD pump used
Î
for cleaning the interior; top up oil (type
SAR90) if necessary.
Clean the grease separator.
Î
Adjust the grease separator controls,
Î
Fill up the grease separator with fresh water up to the at-rest water level (drain
Î
connection pipe bottom):
All types: through the intake pipe or an inspection door.
■
Alternatively for types -S, -SE (optional for types: Basis, -D): through the ball valve of
■
the fresh water filling unit.
Alternatively for types -A, -AE: Switch on the
■
"Controls and displays (box
The water level will rise automatically up to the lower level in the vessel.
Close inspection doors.
Î
Open the slide in the intake and outlet pipes.
Î
Check the grease separator and all the pipe connections for impermeability.
Î
For models with a disposal and cleaning system: carry out a test run,
Î
„Extension stage 3 (with a disposal pump)".
52
section 4.2.2 „Menu settings"
fresh water inflow,
).
section 4.2.1
section 4.4.7