User Manual
Operating Instructions
Installation position of the printed circuit boards
PCB 1
Control and power supply board inside the
housing
Mode of Operation
PCB 2
Printed circuit board 236-10697-1
>
Pause time
PCB 3
Time sequence diagram
1)
Operating cycle = Pause time + Lubricating time
LINCOLN GmbH • Postfach 1263 • D-69183 Walldorf • Tel +49 (6227) 33-0 • Fax +49 (6227) 33-259
T-PCB-020a10
Operating
<
1)
Cycle
>
<
The printed circuit board 1 (for VDC & VAC pumps) and
the power supply board 2 (only for VAC pumps) are in-
tegrated in the pump housing.
6001a02
1
- control printed circuit board
2
- power supply board
6344b04
The printed circuit board automatically controls the se-
quence of the pause and lubricating times of the
lubrication
pump.
The sequence of the pause and lubricating times is acti-
vated when the power supply is switched on:
- via machine contact
- via driving switch
A operating cycle consists of one pause time and one
lubricating time. Once the pause time has elapsed, the lu-
bricating time starts to run. This operating cycle is repeated
permanently after the machine or the vehicle has been put
into operation.
During the lubricating time, the pump element dispenses
the lubricant to the lubrication points via downstream pro-
gressive metering devices.
2.6EN-28006-E11
IMPORTANT
Whenever the pump housing has been
opened (e. g. for replacing of the p.c.b.), the
housing cover (including the foamed seal)
must be replaced.
(input VDC)
(input VAC, output VDC)
.
for VDC or VAC pumps
.. industrial application
only for VDC pumps
.. mobile applicaiton
central
Page 5 of 22