User Manual
Operating Instructions
PCB 7
Rotary switch for lubricating time, red
Switch position
1
Seconds
8
Minutes
2
Operational Test / To Trigger an Additional Lubrication
PCB 8
Components of the control p.c.b.
1
- LED, left-side
2
- Rotary switch to set pause time
3
- LED, right-side
4
- Rotary switch to set lubricating time
5
- Pushbutton to trigger additional lubrication
Page 8 of 22
LINCOLN GmbH • Postfach 1263 • D-69183 Walldorf • Tel +49 (6227) 33-0 • Fax +49 (6227) 33-259
T-PCBv-020e10
2
3
4
5
16
24
32
40
4
6
8
10
T-PCBv-020f10
Lubricating time setting
The lubricating time can be set to 15 different settings by
mans of the red rotary switch.
Depending on the position of the jumper (see fig. PCB 5
the necessary time interval is adjustable (8-120 seconds or
2-30 minutes).
NOTE
During switching position 0 a failure report
at the light emitting diode takes place on the
right LED 3 (see fig. PCB 8).
At the same time the factory-set lubricating
6001a02
time is accepted.
6
7
8
9
48
56
64
72
12
14
16
18
Switch on the power supply (machine contact / driving
switch).
To check whether power is applied to the printed circuit
board, observe whether the LED 1 is lit.
To check the pump operation it is possible to perform an
operational test.
Press illuminated pushbutton 5 on p.c.b. > 2 sec. until the
right-side LED 3 is lit.
Then the pause time lapses shorter and is followed by a
normal operating cycle.
Additional lubrications are possible at any time by trigger-
ing the illuminated pushbutton.
2.6EN-28006-E11
A
B
C
D
80
88
96
104
20
22
24
26
E
F
112
120
28
30