Lighting The Fire; Adding Fuel (Wood) - HASE Granada Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

10. Lighting the Fire

It is important to pass through the
lighting phase quickly since during
the lighting or fi ring phase, higher
Completely open primary
and secondary air.
emission values may occur if mi-
stakes are made. Therefore, for the
sake of the environment, please ob-
serve the following closely. The sto-
ve should always be lit with wood.
Open fi re grate
Due to the large fi re chamber win-
Slightly open ash drawer
dow of the Granada / Kyoto, it is
particularly important to start the
Pile up any remaining ash
and unburned Charcoal
fi re properly. Therefore, please en-
into the centre of the
sure that you pay close attention to
combustion chamber.
the instructions and information on
Place 2-3 small logs into
the right side. Use only thoroughly
the middle of the fi re box;
stack approx. 0.5 kg of
dried wood, at best stored near the
dry wood chips on top.
stove for several days (comply with
safety distances). Softwood chips
Light the ignition material
at several places.
are particularly well-suited for kind-
ling the fi re (e.g. spruce).
Once the wood is lit
suffi ciently on all sides
close the ash drawer, and
some 10-15 minutes later
the primary air slide (I
Set secondary air slide
(II) later to ideal position
(after around 15-20 min.)
Tab. 1
Lighting the Fire
Procedure
Position of Control
Elements
Pull primary and secondary
air sliders all the way out.
Pull out fi re grate slider
Open fi re box door
Close fi re box door
Set primary air
valve (I) to zero
Set secondary air
valve (II) to 3 to 4

11. Adding Fuel (Wood)

More fuel (wood) should be ad-
ded to the fi re during the burning
off phase, when the fl ames from
Adjust primary and
secondary air.
the previous burning off phase
have just gone out.
Close fi re grate.
Add two logs weighing
approx. 1.4 kg in total.
Place logs with one end to
the front of fi re box. Only
add a single layer of fuel.
Wood should be added
when the fl ames of the
prior fi re are about to die
Tab. 2
Adding Fuel (Wood)
Procedure
Position of Control
Elements
Close primary air slider
(I), set secondary air slider
(II) to position 3-4.
Pull out fi re grate slider.
Open fi re box door
Close fi re box door
59

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Kyoto

Table des Matières