Lighting The Fire; Adding Fuel / Heating At Nominal Thermal Output - HASE Lima B.11 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

unless absolutely necessary. Make sure the
room is well-ventilated and open the windows
and outside doors. If needed, use a fan for
faster air circulation.
If the maximum temperature is not reached during the first
heating operation, you may notice an odour for a short period
of time the next time the stove is used as well.
7.
Lighting the Fire
The firing up phase should be as short as possible, since higher
emissions can occur during this phase.
The slider settings described in Table 1 (see figure on the right)
are recommendations that were determined under confor-
mance testing conditions, in compliance with the relevant stan-
dard. Depending on the weather conditions and the draught
capability of your chimney, accordingly adjust the slider posi-
tions for your Lima to the local conditions.
CAUTION!
The Lima may only be operated when the fire
box door is closed; the fire box door may
only be opened to add fuel.
WARNING!
Never use spirits, petrol, or other flammable
fluids to light the stove.
34
Lighting the Fire
Procedure
Position of Control
Completely open primary
Pull primary and secondary air
and secondary air.
slider all the way out. (fig. 6)
Open fire grate.
Pull out fire grate slider.
Pile up any remaining ash
and unburned Charcoal
into the centre of the
combustion chamber.
Place 2-3 small logs into
the middle of the fire box;
stack approx. 0.5 kg of dry
wood chips on top.
Light the ignition material
at several places.
Tab. 1
fig. 6
8. Adding Fuel / Heating at Nominal Thermal Output
More fuel should be added to the fire when the flames from
Elements
the previous burning off phase have just gone out.
Adding Fuel / Heating at Nominal Output
Procedure
Adjust primary and
secondary air.
Close fire grate.
Add two logs weighing approx.
1,5 kg in total. Place logs with
one end to the front of fire box.
Only add a single layer of fuel.
Tab. 2
fig. 7
Position of
Control Elements
Close primary air slider,
set secondary air slider to
position 2,5 - 3. (fig. 7)
Push in fire grate slider.

Publicité

Table des Matières
loading

Table des Matières