Maintenance And Repair - ALFRA 18554 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Cleaning
Danger of injuries by unintentional switching on. Pull plug prior to cleaning.
Clean motor by means of dry compressed air (from the outside).
Check connecting lines on damages.
Clean and grease sliding surfaces regularly. Should, nevertheless, lateral play
arise by wear of the dovetail guide, this could be adjusted by adjusting the
laterally positioned set screws (K).
Carbon brushes should be replaced after appr. 250 hours running time.
After the work is finished, we recommend to store the Metal Core Drilling
Machine in the transport case in a lying position.

Maintenance and repair

Maintenance, check and repairs are only to be made by electronics
specialists according to the valid regulations of the respective country.
The Metal Core Drilling Machine ALFRA ROTABEST should be serviced after
appr. 250 hours running time by our Alfra workshop or appointed dealers.
Only use genuine ALFRA spare parts.
Spare part list at the end of this operation manual.
Guarantee
For our ALFRA Rotabest Metal Core Drilling Machines we grant guarantee
according to the legal and regional regulations (proven by invoice).
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

18555Rotabest mini 38/50 weldon

Table des Matières