Maintenance and repair
Maintenance, checks and repairs are only to be made by electronic specialists according to the valid regulations of
the respective country.
Only use genuine spare parts.
Spare part list at the end of this operation manual.
The metal core drilling machine should be serviced after appr. 250 hours running time by our workshop or
appointed dealers. The Gear oil (Lubcon, Turmogearoil PE 150 300ml) should be exchanged as well as the
brushes.
17