I
NSTALLATION
8
Connect hoses prepared in
Step 3 to hose terminals
28G (Current Models)
9
Install stop block kit
• Preheat each stop block and carriage bar
weld area to 180° C (325° F).
• Use AWS E-7018 low hydrogen rod and
weld a 6 mm (.25 in.) fillet around each
stop block.
NOTE: Do not
weld stop block
on inside
1.5 mm
(1/16 in.)
Truck Upper
Carriage Bar
28G (Earlier Models), 36G-140G
6038011-R4 EN
CL5342.eps
120G, 140G
Upper
Mounting
Hook
Steel Stop
Blocks
(both sides)
6 mm (.25 in.) fillet
weld on three sides
RC0224.eps
28G (Earlier Models), 36G-77G
CL5191.eps
1.5 mm
(1/16 in.)
Truck Upper
Carriage Bar
28G (Current Models)
Upper
Mounting
Hook
6 mm (.25 in.) fillet
RR0561.eps
weld on three sides
CL2993.eps
Steel Stop
Blocks
(both sides)
7