Dexxo Pro io
3 - INSTALLATION
3.1 Installation height - Fig. 4
the ceiling.
falls between 10 and 200 mm.
3.2 Detailed description of installation steps - Fig. 5 to
15
> Mounting the lintel bracket and the door bracket (Fig. 5)
lintel by up to 200 mm max. (Fig. 5-
> Assembling the two part rail (Fig. 6)
[1] [2] [3]. Unfold the two parts of the rail.
Ensure that the chain or belt is not twisted.
[4]. Assemble the two parts of the rail using the sleeve.
[5]. Mount the complete assembly using the eight mounting screws.
[6]. Tighten the nut to tension the chain or belt. The compressed rubber must
measure 18 and 20 mm.
The mounting screws must not penetrate the rail (do not drill).
mounting screws.
> Fitting the rail onto the motor head (Fig. 7)
> Fitting the complete assembly onto the garage ceiling (Fig. 8
to 10)
> Fitting to the lintel bracket (Fig. 8)
> Ceiling mounting
-
rail (Fig. 9).
It is possible to add mounting points at the motor head level (Fig. 9-
-
-
mount the system at the motor head (Fig. 10-
-
mount the system at the rail (Fig. 10-
(Fig. 10-
).
> Fitting the arm onto the door and the trolley (Fig. 11)
In case the handle release system is positionned greater height
[1].
[2]. Bring the trolley up to the door.
[3]. Attach the arm to the door bracket and the trolley.
> Adjusting and fastening the opening travel stop (Fig. 12)
[1].
and bring the door to the open position.
travel stop.
[2].
[3]. Position the travel stop against the trolley.
[4]. Moderately tighten down the mounting screw.
Copyright © 2015 SOMFY ACTIVITES SA. All rights reserved
).
).
a
)
b
)
Do not tighten the mounting screw all the way down. Excessive
tightening can damage the screw and cause the travel stop not to
remain in place.
> Fitting the chain retainer pads (Fig. 13)
For chain rails only.
These pads are used to limit spurious noise linked to chain friction within the
Make sure that the pad is pressed in all the way so that its positioning pin is
accessible outside of the rail.
> Checking the chain or belt tension (Fig. 14)
tensioning.
operation.
> Connecting the mains power supply (Fig. 15)
[1].
[2]. Fit the light bulb.
[3]. Connect to the antenna.
[4]. Connect to the mains supply.
Plug the power cable into a suitable power outlet that complies with
electric power requirements.
4 - PROGRAMMING
4.1 Programming button description
Buttons
Function
-
-
-
-
-
- Stop learning
- Selecting a setting
- Modifying a setting value
- Using the forced mode
- Start the learning cycle
-
-
4.2 End limit setting and self-learning - Fig. 16
learning.
[1].
SET
S2
[2]. Control the motor using the "+" or "-" buttons so that the transmission
system runner moves to link up with the trolley and closes the door.
-
Release the "-" button before the motor has time to force against
the door.
- Pressing and holding the "+" button opens the door.