EN
07
08
09
10
16
Glue the ridges with Pattex Stabilit or Uhu En-
fest. (If not available use 15 min Epoxy) With
this kind of installation the ESC will be be ins-
talled under the tray.
The battery tray will be srewed in the fuselage
and if needed easily removed. The ESC is
not visible. After installing the motor the fuse-
lage is finished.
THE WINGS
ARF VERSION ONLY:
Cut an opening for the clevis of the flaps in
the wing. Prepare the hole for the control horn
within this step.
ARF VERSION ONLY:
Glue the controll horn in an 45° angle to the
surface of the flap.