Télécharger Imprimer la page

ECOVACS GOAT O800 RTK Manuel D'instructions page 21

Publicité

5. Connect the RTK Reference Station power cable to the Charging
Station power cable and tighten the nut.
A
B
Note:
The Charging Station has two cable ports: the longer one is for the Power
Adapter and the short one is for the RTK Reference Station.
6. After powering on, please wait one minute to check the indicator light
status. If the RTK Reference Station indicator remains steady blue,
the location is ideal with good signal; if it flashes, relocate the RTK
Reference Station, until you find the perfect position.
7. After locating the perfect spot, insert the RTK Station Fixing Fork Peg
into the ground.
Note:
DO NOT install the RTK Reference Station to a spot where the ground is soggy
and mushy, otherwise the pole may easily tilt, thus undermining the working
accracy of the RTK Reference Station.
The RTK Reference Station should be oriented vertically, as shown below:
21 EN

Publicité

loading

Ce manuel est également adapté pour:

Goat o1200 rtk